Costa Rica ocean freight by the numbers
Last updated:
Shipzy samples 36 port-to-port lanes for Costa Rica, on which 6 ocean carriers publish schedules, connecting 16 countries.
The fastest scheduled transit is 11 days, the median scheduled transit is 34 days, and 9 in 10 sampled sailings complete within 73 days.
7% of the 243 sampled sailings are direct; the remainder route via a transshipment hub.
The VGM cutoff falls a median of 2 days before departure, across 130 sampled sailings.
Figures describe 243 sailings sampled from 6 carrier APIs, last refreshed 29 August 2026.
Cutoff lead times in Costa Rica
| Cutoff | Median days before departure | Sailings sampled |
|---|---|---|
| Dangerous goods cutoff | 5 | 38 |
| Reefer cutoff | 4 | 48 |
| Documentation cutoff | 3 | 95 |
| VGM cutoff | 2 | 130 |
| Cargo cutoff | 2 | 56 |
| Port cutoff | 2 | 90 |
| Terminal cutoff | 1 | 23 |
Most-sampled trade lanes from Costa Rica
| Partner country | Lanes sampled |
|---|---|
| US | 5 |
| AE | 4 |
| CN | 4 |
| DE | 4 |
| NL | 4 |
How these numbers are measured
Figures come from the ocean schedule APIs Shipzy integrates with: CMA CGM, COSCO, MSC, Maersk, ONE, ZIM. They describe the lanes Shipzy samples, not every sailing serving Costa Rica.
The nightly sync sweeps nine global hub ports plus a set of regional template lanes, storing up to three sailings per lane, and refreshes one country per night. So coverage leans towards intercontinental routings, and the as-of date above can be several weeks old for smaller markets.
Transit figures are medians rather than averages, so a few multi-transshipment routings cannot distort them. Cutoff lead times exclude carrier-estimated cutoffs and any lead outside a 0–21 day window. Emissions figures are not published here, because only one carrier reports measured CO2; the rest are modelled from transit time and would restate transit days as emissions.
- Carriers sampled: Derived from ocean schedules published by 6 carrier APIs, as of 29 August 2026.
- Of global fleet capacity: Sum of each sampled carrier’s share of global container capacity. Describes the carriers, not this country’s market share.
- Port-to-port lanes: Derived from ocean schedules published by 6 carrier APIs, as of 29 August 2026.
- Countries connected: Derived from ocean schedules published by 6 carrier APIs, as of 29 August 2026.
- Fastest transit: Derived from ocean schedules published by 6 carrier APIs, as of 29 August 2026.
- Median transit: Median of 243 scheduled transit times. Median, not mean — a few multi-transshipment routings would distort an average.
- Direct sailings: Share of 243 sampled sailings with no transshipment. Carriers count legs slightly differently, so treat as indicative.
- Named services: Derived from ocean schedules published by 6 carrier APIs, as of 29 August 2026.
- Vessels seen: Derived from ocean schedules published by 6 carrier APIs, as of 29 August 2026. Counted by vessel name, so spelling variants may inflate this slightly.
